Monday, November 25, 2013

Nursery Trees

Steve & Rusty follow Tree Lady.

Tree Lady tags the Excelsa cedar we selected.

Jordan & Tree Lady head toward the field of vine maple.

Cascade Mountains in the distance.

Jordan inspects a vine maple.

We rented a cargo van & drove 45 minutes to NurseryTrees.com in Snohomish on Saturday, November 23.  The day was beautifully sunny & somewhat cold.  Frozen mud lay between the rows of trees.  Tree Lady showed us fields of trees with snowy mountains beyond, across the Snohomish Valley.  We chose 3 vine maples (Acer circinatum) & 1 Excelsa cedar (Thuja plicata 'Excelsa').  It took a long time for the 2 Mexican men to dig them up, wrap the roots in burlap & forklift them into the van.  The trees were all about 8 feet tall with root balls 2 feet in diameter.  We returned to Ell Alley, unloaded & placed the vine maples in their holes, laid the cedar on the path & returned the van.  On the followed day, the cedar was set in its hole.  The new garden was transformed with the addition of sizeable trees.

Saturday, November 23, 2013

Bruksbo Veggen De Luxe

The carpenter at work.

Bruksbo Veggen De Luxe wall-mounted furniture in the dining room on 11-16-13.




Bruksbo Veggen De Luxe wall-mounted furniture in the office on 11-16-13.

Two weeks after we had moved into Ell Alley, the carpenter came to mount the Bruksbo Veggen De Luxe furniture on the walls.  Most of the pieces went in the office, where there are 3 desks, drawers, shelves & a cabinet with sliding glass doors.  In the dining room, right across from the table, are the remaining pieces: another cabinet with sliding glass doors, a cupboard, drawers & a magazine rack.  Jordan's parents collected these pieces between 1961 & 1981.  In fact we have a file with a check dated 28 Jan 1961, made by Colleen.  The Veggen De Luxe line was designed by Thorbjørn Afdal for Bruksbo Tegnekontor & manufactured by Mellemstrands Trevareindustri in Norway.  

Thursday, November 21, 2013

Moving Day

Jetta at Ell Alley on 11-2-13.

The living room on 11-2-13.

The living room arranged.

The bed after delivery on 11-2-13.

The bed made.

The dining room & kitchen on 11-2-13.

Steve & Rusty at the dining room table on 11-2-13.


We moved in on Saturday November 2, 2013.  We had moved a few things by car on November 1.  But 11/2 was the day we got the truck & the hired guys came to load & unload it.  Rusty & Steve spent the day supervised the movers at the apartment & the storage space.  Jetta & Jordan stayed at Ell Alley while the delivery guys came from Sears with the bed, refrigerator, washer & dryer.  Jordan arranged furniture & unpacked boxes.  That evening, we had take out food from Thai Recipe.

Tuesday, October 22, 2013

Final Countdown

Forbidden planting under the ash tree at Ell Alley on October 22, 2013

The truck with the granite counter tops at Ell Alley on October 22, 2013

The new fence at Ell Alley on October 22, 2013

The new fence at Ell Alley on October 22, 2013

The buildings across the alley on October 22, 2013

On October 22, 2013 (when these photos were taken) there were only 9 days left before we took possession of the house.  The truck with the granite counter tops was there.  We had visited the site several times already that month.  It was surprising to find that the critical root zone under the ash tree had been planted by the landscape crew as they worked in the area around the rest of the building.  It was supposed to be left unplanted & covered in bark.  It was obvious that, among our neighbors, only we had proposed & been given approval for an alternate landscape plan.  

On another day, we ran into one of the owners of the development company.  We talked with him at length.  He was very pleasant & wore stylish construction-type clothes.  After he left, we all said, 'What a great outfit!'  The fence was being built then.  The walls, roofs & most of the siding on one of the 2 buildings across the alley had been completed & work had begun to pour the foundations of the other.  We met the new owners of one of the unfinished units.  They expected to be our neighbors in about 9 months.  On our side of the alley was one building with 5 units.  On the other side would be 2 buildings with 3 units each.  These were the last buildings to be constructed in our development.

Also during the month of October, we made several trips to buy a refrigerator, washer & dryer, dining table & chairs, & a king-sized bed.  We were all very excited & full of ideas about the house.

Sunday, September 22, 2013

Concrete

Entry walk from the sidewalk on Renton Avenue S in September 2013.

Entry walk across the front & down the side of the house in September 2013.

Front porch, which is actually on the side of the house in September 2013.

Back porch & stairs to garage in September 2013.

Retaining wall with very little space left for planting in September 2013.

New building across the back alley in September 2013.

By the end of September 2013, concrete for the walks & porches had been poured.  There were stairs down from the street, in front of the house next door.  The walk to our front door curved around the critical root zone of the ash tree in front of our house, crossing in front of the neighboring house, which seemed an invasion of their personal space.  The front porch was a pad of exposed-aggregate concrete.  The back porch was a much larger pad of smooth concrete, which left very little room (about 3 feet) for planting on that level.  However, there was much more room for patio furniture & pots than expected.  The kitchen island had been installed & some of the cabinets had been mounted. The interior walls had been painted a color that was not quite gray & not quite beige.  The floorboards had been laid on the ground level, but not upstairs.  The bathrooms were far from finished.  We were giving the date of October 31 for closing the sale of the house, which seemed quite an inconvenient date for moving out of the apartment.  The construction of the new building across the back alley had advanced at a rapid pace.

Friday, August 23, 2013

Painted Exterior

Ell Alley at upper left. August 2013.

North & west walls, plus garage.

North & east walls.

Front porch.

Back porch.

The ground floor is one big room.

Master bedroom.

 
 View from master bedroom. Ell Alley August 2013.

By mid-August of 2013, the exterior was painted dark gray-blue, tan & cream with black trim.  The sheet rock was hung on the interior walls.  Construction had started on the residential units across the alley & foundations were poured for their garages.  All of the building in the Allegro development had been built, or were under construction, except for the 3-unit building directly across from Ell Alley.  Even more exciting, the Seattle Housing Authority approved Jordan's landscape plan.

Sunday, July 14, 2013

Doors & Siding

Ell Alley at far right of building 8 in July 2013.

Ell Alley, east & north walls.

Stairs from garage to terrace & retaining wall.

Ell Alley at left with garage.

 
New building of 3 units begun below Ell Alley in July 2013.

By mid-July of 2013 the doors & siding were installed.  The doors were locked when the workers left, so we were unable to see the interior very often.  We did see that they were installing the wiring & plumbing.  Work started on a building of 3 units across the alley below building 8, on the southern half of that lot.  Another building of 3 units was planned for the northern half of the lot.