East bedroom: new paint
Master bedroom: new paint & California Closets
Master bathroom: new paint & light fixture
Hall: new paint
Living room: new paint & floor lamp
Living room: new pain & wall
Hall & living room: new paint & UHDTV
Dining room: new paint & California Closets
Dining room: new paint & hanging lamp
Pantry: new paint & California Closets
Kitchen: new paint, chairs & pendant lights. Photos taken in July 2015.
Ell Alley was remodeled during 5 weeks of May & June 2015. The contractor & his employees were here on 21 days during that period of time.
The remodel included the demolition of the closets in the kitchen & master bedroom, replaced by closet systems from California Closets. Shelves & drawers with a bench were installed around the window in the dining room.
A short partition wall was built near the bottom of the stair. It replaced a railing. All the window ledges were tiled. The master bedroom & east bedroom got ceiling fans. The master bedroom got new carpet.
The downstairs walls were painted yellow & blue. The blue continues up the wall beside the stairs to become one wall of the hall. The other walls & ceiling are light green. The master bedroom & bathroom are dark green. The north bedroom is bright green. The east bedroom is pumpkin with a cream ceiling.
Four new chairs, a foot stool, 3 ceiling lamps, a floor lamp & a 65 inch UHDTV were purchased.
And here are photos taken by Steve:
Master bedroom: new chair
Master bedroom: new foot stool
Living room: new paint & floor lamp
Dining room & kitchen: Jordan, Rusty & Kitty