Near the end of January 2013, preparation for construction began on the site.  A sign was posted, 2 large trees were removed & the ground was smoothed.  Then in March, holes were dug & concrete began to be poured for the foundation.  From the height of the forms, it appeared the the crawl space beneath the townhome would be capacious: a good place for garden tools & camping gear.  We were puzzled about the garage, which seemed to be well below the level of the house.  Would there be stairs?  The other buildings in the development were all on level ground.